January 22nd Site Update

Thing’s are moving along nicely on site, with all three buildings in the works!
SHORELINE: 2nd floor framing walls stood, while joisting the 3rd floor.
BREAKWATER: 4th floor hardwood is being installed. Along with the 3rd floor tile floor, cabinets, and trim. Additionally, the 2nd floor is receiving the finished drywall mud.
OCEAN BREEZE: Level one suspended slab deck being formed, with more slab on grades being poured.
Check back next month for drone footage of The Haro’s progress! In the mean time, head over to our instagram: @theharoatcordovabay for more photo’s and information.